Rubbersidewalks vs. Concrete
Benefits Rubbersidewalks Concrete Asphalt
Life Cycle Near Tree Roots 20+ years 5 years 2 years
Material Cost*
*Under 1,000 sq. ft
$10.00/sf $6.00/sf $3.00/sf
Labor 2 man crew 4 Man Crew 4 man crew
Recycled Materials 100 Percent 0 percent 0 percent
ADA Compliance Low vibration High vibration High vibration
Size 2’ x 2.5’ x 1.875”,
2’ x 2’ x 1.875”
Fit to Form Fit to Form
Weight 10.8 lbs per sq ft @ 1 7/8” 46.87 lbs per sq ft @ 2” 24.4 lbs per sq ft @ 2”
Surface Changes Safety-All: No change
Uncoated: Moderate fading, discoloration
Cracking, staining, discoloration Chipping and holes
Mass Changes Possible settling requiring sub-base adjustment Lifting, breaking Lifting, deterioration
Shock Attention Under 200 g @ 5 ft causes less injuries Over 200 g Over 200 g
Maintainable 100 percent 0 Percent 0 percent
Walking Comfort Best Worst Better
Porosity Best
(.54” per hour)
Worst
(.00” per hour)
Better
(.20” per hour)
Coefficient of Friction .90 Dry/.65 wet .60 Dry/.50 Wet .50 Dry/.25 Wet
Environmental Concerns None Lime, Heat Island Effect Resin, Heat Island Effect

 

 

The resources of the earth are limited. Recycling is limited only by our imagination and effort.

Corporate Office
2622 West 157th Street • Gardena, CA 90249

Sales and Marketing Office
10061 Talbert Avenue, #200 Fountain Valley, CA 92708
Phone: 714 964 1400
Fax: 714 964 8600
Toll-Free: 877 RSI 4ECO (877-774-4326)


WebSite Powered by: